{"id":675,"date":"2026-05-26T03:22:45","date_gmt":"2026-05-26T03:22:45","guid":{"rendered":"https:\/\/rock-crusher-tractor.com\/?p=675"},"modified":"2026-05-26T03:22:45","modified_gmt":"2026-05-26T03:22:45","slug":"ct-2100-rock-picker-operation-capacity-planning-guide-korea","status":"publish","type":"post","link":"https:\/\/rock-crusher-tractor.com\/tr\/ct-2100-rock-picker-operation-capacity-planning-guide-korea\/","title":{"rendered":"CT-2100 Ta\u015f Toplay\u0131c\u0131 \u2014 Kore \u00c7iftlikleri \u0130\u00e7in Eksiksiz \u00c7al\u0131\u015ft\u0131rma ve Kapasite Planlama K\u0131lavuzu"},"content":{"rendered":"<div style=\"font-family: Georgia,'Times New Roman',serif; font-size: clamp(14px,2vw+10px,18px); color: #333; line-height: 1.8; word-break: break-word; overflow-wrap: break-word; max-width: 100%; box-sizing: border-box;\">\n<p><!-- HERO --><\/p>\n<div style=\"position: relative; background-image: url('https:\/\/rock-crusher-tractor.com\/wp-content\/uploads\/2025\/11\/CT-2100-Rock-Picker-application-1.webp'); background-size: cover; background-position: center 38%; min-height: 490px; display: flex; align-items: center; justify-content: center; text-align: center; padding: 80px 20px; margin-bottom: 48px; border-radius: 6px; overflow: hidden;\">\n<div style=\"position: absolute; inset: 0; background: linear-gradient(to bottom,rgba(0,0,0,0.46) 0%,rgba(0,0,0,0.74) 100%);\"><\/div>\n<div style=\"position: relative; z-index: 1; max-width: 760px; color: #fff;\">\n<h1 style=\"font-size: clamp(22px,3.8vw+10px,44px); font-weight: bold; color: #fff; line-height: 1.2; margin: 0 0 20px 0; text-shadow: 0 2px 8px rgba(0,0,0,0.55);\">CT-2100 Rock Picker \u2014 Complete Operation and Capacity Planning Guide for Korean Highland and Agricultural Farms<\/h1>\n<p style=\"font-size: clamp(14px,1.8vw+9px,18px); color: rgba(255,255,255,0.9); margin: 0 0 28px 0; line-height: 1.6; max-width: 640px; margin-left: auto; margin-right: auto;\">The CT-2100 is the machine that converts a stone crushing pass into a complete clearance system. Without collection, the crushed material stays in the field. With the CT-2100, it leaves. Understanding how to operate and plan the CT-2100 makes the difference between a THOR pass that solves the stone problem and one that only moves it.<\/p>\n<p><a style=\"display: inline-block; background: #f07c00; color: #fff; padding: 14px 38px; border-radius: 4px; text-decoration: none; font-weight: bold; font-size: clamp(13px,1.5vw+9px,16px); letter-spacing: .02em; box-shadow: 0 4px 14px rgba(0,0,0,0.4);\" href=\"https:\/\/rock-crusher-tractor.com\/tr\/contact-us\/\">CT-2100 Enquiry and Availability<\/a><\/p>\n<\/div>\n<\/div>\n<p><!-- INTRO --><\/p>\n<p>O <a style=\"color: #f07c00; text-decoration: none; font-weight: bold;\" href=\"https:\/\/rock-crusher-tractor.com\/tr\/urun\/ct-2100-rock-picker-110-hp-professional-stone-collector-with-2-5-m\u00b3-bunker-korea-stock\/\">CT-2100 ta\u015f toplay\u0131c\u0131<\/a> is described in most Korean agricultural discussions as the completion machine for the THOR stone crusher \u2014 the machine that picks up what the THOR has crushed and deposits it at the field headland for truck collection. This framing is correct but incomplete. The CT-2100 is also the machine used for light-year surface collection after the EP-EW-4000 rock rake, the annual maintenance collection pass on orchard alleys, and the surface stone collection on fields where the THOR was not needed. Understanding the CT-2100&#8217;s full range of Korean highland applications \u2014 and how to plan its daily capacity against the THOR and rake systems it follows \u2014 is the practical knowledge that keeps the stone clearing sequence moving efficiently.<\/p>\n<p><!-- SECTION: CONFIRMED SPECS --><\/p>\n<h2 style=\"font-size: clamp(20px,2.8vw+10px,30px); color: #1a1a1a; border-left: 5px solid #f07c00; padding-left: 16px; margin: 48px 0 20px 0; line-height: 1.3;\">CT-2100 Confirmed Specifications<\/h2>\n<p><img decoding=\"async\" style=\"width: 100%; height: auto; display: block; border-radius: 6px; margin: 20px 0 28px 0;\" title=\"CT-2100 Rock Picker \u2014 Full Specifications\" src=\"https:\/\/rock-crusher-tractor.com\/wp-content\/uploads\/2025\/11\/CT-2100-Rock-Picker-1.webp\" alt=\"CT-2100 rock picker \u2014 110HP, 2.5m\u00b3 bunker, 80Kg maximum stone, 1.95m working width, Korean local stock\" \/><\/p>\n<p style=\"color: #888; text-align: center; font-size: clamp(11px,1.1vw+7px,13px); margin-top: -16px; margin-bottom: 28px;\">Watanabe resmi \u00fcr\u00fcn bro\u015f\u00fcr\u00fcndeki t\u00fcm \u00f6zellikler.<\/p>\n<div style=\"display: flex; flex-wrap: wrap; gap: 10px; margin: 0 0 32px 0;\">\n<div style=\"flex: 1 1 130px; background: #1a1a1a; color: #fff; text-align: center; padding: 16px 10px; border-radius: 8px; box-sizing: border-box;\">\n<div style=\"font-size: clamp(22px,2.8vw+12px,28px); font-weight: bold; color: #f07c00; line-height: 1.1;\">110<span style=\"font-size: .5em; font-weight: normal; color: #bbb;\"> HP<\/span><\/div>\n<div style=\"font-size: clamp(10px,1vw+7px,11px); color: #bbb; margin-top: 4px;\">Min. tractor<\/div>\n<\/div>\n<div style=\"flex: 1 1 130px; background: #f07c00; color: #fff; text-align: center; padding: 16px 10px; border-radius: 8px; box-sizing: border-box;\">\n<div style=\"font-size: clamp(22px,2.8vw+12px,28px); font-weight: bold; line-height: 1.1;\">2.5<span style=\"font-size: .5em; font-weight: normal; opacity: .9;\"> m\u00b3<\/span><\/div>\n<div style=\"font-size: clamp(10px,1vw+7px,11px); opacity: .9; margin-top: 4px;\">Bunker kapasitesi<\/div>\n<\/div>\n<div style=\"flex: 1 1 130px; background: #1a1a1a; color: #fff; text-align: center; padding: 16px 10px; border-radius: 8px; box-sizing: border-box;\">\n<div style=\"font-size: clamp(22px,2.8vw+12px,28px); font-weight: bold; color: #f07c00; line-height: 1.1;\">80<span style=\"font-size: .5em; font-weight: normal; color: #bbb;\"> Kilogram<\/span><\/div>\n<div style=\"font-size: clamp(10px,1vw+7px,11px); color: #bbb; margin-top: 4px;\">Maksimum ta\u015f boyutu<\/div>\n<\/div>\n<div style=\"flex: 1 1 130px; background: #1a1a1a; color: #fff; text-align: center; padding: 16px 10px; border-radius: 8px; box-sizing: border-box;\">\n<div style=\"font-size: clamp(22px,2.8vw+12px,28px); font-weight: bold; color: #f07c00; line-height: 1.1;\">1.95<span style=\"font-size: .5em; font-weight: normal; color: #bbb;\"> M<\/span><\/div>\n<div style=\"font-size: clamp(10px,1vw+7px,11px); color: #bbb; margin-top: 4px;\">\u00c7al\u0131\u015fma geni\u015fli\u011fi<\/div>\n<\/div>\n<div style=\"flex: 1 1 130px; background: #1a1a1a; color: #fff; text-align: center; padding: 16px 10px; border-radius: 8px; box-sizing: border-box;\">\n<div style=\"font-size: clamp(18px,2vw+10px,22px); font-weight: bold; color: #f07c00; line-height: 1.1;\">3\u20135<span style=\"font-size: .5em; font-weight: normal; color: #bbb;\"> km\/sa<\/span><\/div>\n<div style=\"font-size: clamp(10px,1vw+7px,11px); color: #bbb; margin-top: 4px;\">\u00c7al\u0131\u015fma h\u0131z\u0131<\/div>\n<\/div>\n<div style=\"flex: 1 1 130px; background: #1a1a1a; color: #fff; text-align: center; padding: 16px 10px; border-radius: 8px; box-sizing: border-box;\">\n<div style=\"font-size: clamp(18px,2vw+10px,22px); font-weight: bold; color: #f07c00; line-height: 1.1;\">60<span style=\"font-size: .5em; font-weight: normal; color: #bbb;\"> L\/dak<\/span><\/div>\n<div style=\"font-size: clamp(10px,1vw+7px,11px); color: #bbb; margin-top: 4px;\">Hydraulic flow (discharge)<\/div>\n<\/div>\n<\/div>\n<p><!-- SECTION: HOW IT WORKS --><\/p>\n<h2 style=\"font-size: clamp(20px,2.8vw+10px,30px); color: #1a1a1a; border-left: 5px solid #f07c00; padding-left: 16px; margin: 48px 0 20px 0; line-height: 1.3;\">How the CT-2100 Works \u2014 Pick-Up Reel, Grader, and Bunker<\/h2>\n<p>The CT-2100 operates on a simple but mechanically robust principle: a rotating tine drum (pick-up reel) at the front of the machine lifts stones from the surface and elevates them into the bunker through a steel cross-bar grader system. The grader bars allow soil to fall back through while retaining stones \u2014 producing a bunker load of stones with minimal soil contamination. The hydraulically-operated rear door discharges the full bunker load at the field headland at the touch of the remote valve control from the tractor cab.<\/p>\n<div style=\"display: flex; flex-direction: column; gap: 8px; margin: 14px 0 24px 0;\">\n<div style=\"display: flex; gap: 12px; background: #f8f8f8; border-radius: 6px; padding: 12px 16px; border: 1px solid #e0e0e0; box-sizing: border-box; align-items: flex-start;\">\n<div style=\"flex: 0 0 32px; height: 32px; background: #f07c00; color: #fff; border-radius: 50%; display: flex; align-items: center; justify-content: center; font-weight: bold; font-size: 14px; flex-shrink: 0;\">1<\/div>\n<div><strong>Pick-up reel.<\/strong> Steel tines on a rotating drum sweep the soil surface at the machine front. Tine spacing is calibrated to lift stones above a minimum size threshold (approximately 3 cm) while allowing fine soil particles to pass. Tine condition is the primary maintenance focus \u2014 worn or bent tines miss smaller stones or fail to lift stones cleanly into the grader section.<\/div>\n<\/div>\n<div style=\"display: flex; gap: 12px; background: #fff; border-radius: 6px; padding: 12px 16px; border: 1px solid #e0e0e0; box-sizing: border-box; align-items: flex-start;\">\n<div style=\"flex: 0 0 32px; height: 32px; background: #f07c00; color: #fff; border-radius: 50%; display: flex; align-items: center; justify-content: center; font-weight: bold; font-size: 14px; flex-shrink: 0;\">2<\/div>\n<div><strong>Cross-bar grader.<\/strong> Stones lifted by the pick-up reel pass over a series of parallel steel cross-bars spaced to allow soil clods to fall back through. This grading action ensures the bunker collects primarily stones \u2014 not a large volume of soil that would rapidly fill the bunker with low-value material. On clay-heavy Korean highland soils in wet spring conditions, soil clods may be large enough to enter the bunker \u2014 working at slightly faster forward speed when soil conditions are wet reduces the proportion of soil clods entering the bunker.<\/div>\n<\/div>\n<div style=\"display: flex; gap: 12px; background: #f8f8f8; border-radius: 6px; padding: 12px 16px; border: 1px solid #e0e0e0; box-sizing: border-box; align-items: flex-start;\">\n<div style=\"flex: 0 0 32px; height: 32px; background: #f07c00; color: #fff; border-radius: 50%; display: flex; align-items: center; justify-content: center; font-weight: bold; font-size: 14px; flex-shrink: 0;\">3<\/div>\n<div><strong>Bunker and hydraulic discharge.<\/strong> The 2.5 m\u00b3 steel bunker accumulates the graded stone load. When full (visually assessed by the operator \u2014 a full bunker is visible above the bunker side rails), the operator drives to the headland discharge point and activates the rear door hydraulic cylinder via the tractor&#8217;s remote valve. The door swings down, depositing the bunker load at the headland. The 60 L\/min hydraulic flow requirement for the discharge operation must be confirmed against the tractor&#8217;s hydraulic output capacity before first use.<\/div>\n<\/div>\n<\/div>\n<p><!-- SECTION: CAPACITY PLANNING --><\/p>\n<h2 style=\"font-size: clamp(20px,2.8vw+10px,30px); color: #1a1a1a; border-left: 5px solid #f07c00; padding-left: 16px; margin: 48px 0 20px 0; line-height: 1.3;\">Daily Capacity Planning \u2014 How Many CT-2100 Passes per THOR Pass?<\/h2>\n<p><img decoding=\"async\" style=\"width: 100%; height: auto; display: block; border-radius: 6px; margin: 20px 0 28px 0;\" title=\"CT-2100 + THOR \u2014 Capacity Planning\" src=\"https:\/\/rock-crusher-tractor.com\/wp-content\/uploads\/2025\/11\/Rock-CrusherRock-Picker.webp\" alt=\"Stone crusher and rock picker in combined operation \u2014 capacity planning determines how many CT-2100 collection passes match the THOR 2.4 crushing output\" \/><\/p>\n<p>The most important capacity planning question for a Korean highland stone clearing operation is: how many CT-2100 collection passes does a single THOR 2.4 crushing pass require? This determines whether a single tractor-and-CT-2100 combination keeps pace with the THOR 2.4, or whether the collection becomes a bottleneck that slows the overall clearing rate.<\/p>\n<div style=\"overflow-x: auto; margin: 14px 0 28px 0;\">\n<table style=\"width: 100%; border-collapse: collapse; font-size: clamp(12px,1.3vw+8px,14px); min-width: 460px;\">\n<thead>\n<tr style=\"background: #1a1a1a; color: #fff;\">\n<th style=\"padding: 9px 12px; text-align: left; border-right: 1px solid #333;\">Stone density \/ field type<\/th>\n<th style=\"padding: 9px 12px; text-align: center; border-right: 1px solid #333;\">CT-2100 passes per THOR pass<\/th>\n<th style=\"padding: 9px 12px; text-align: left;\">Implication<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr style=\"background: #fff;\">\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Light frost-heave (established field)<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee; text-align: center; font-weight: bold; color: #2d5f2d;\">1 CT-2100 pass per THOR pass<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Single tractor-CT-2100 keeps pace with THOR; one operator each<\/td>\n<\/tr>\n<tr style=\"background: #f8f8f8;\">\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Moderate stone (typical established field)<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee; text-align: center; font-weight: bold; color: #c86000;\">1\u20132 CT-2100 passes per THOR pass<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">CT-2100 may need to make 2 passes per THOR pass in some sections; operator can assess per section<\/td>\n<\/tr>\n<tr style=\"background: #fff;\">\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Heavy stone (new land or severe winter)<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee; text-align: center; font-weight: bold; color: #cc3333;\">2\u20134 CT-2100 passes per THOR pass<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Consider a second CT-2100 to maintain pace with THOR on heavy-stone new land<\/td>\n<\/tr>\n<tr style=\"background: #f8f8f8;\">\n<td style=\"padding: 8px 12px;\">After EP-EW-4000 rake (light year)<\/td>\n<td style=\"padding: 8px 12px; text-align: center; font-weight: bold; color: #2d5f2d;\">1 CT-2100 pass per rake pass<\/td>\n<td style=\"padding: 8px 12px;\">Rake windrows are well-defined; CT-2100 follows directly in the windrow line<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The 2.5 m\u00b3 bunker fills in approximately 300\u2013600 linear metres of collection pass on typical Korean highland stone density \u2014 varying with stone size and density. On a 300 m field at 1 pass per row spacing, the CT-2100 fills approximately every 1\u20132 passes before needing headland discharge. Each discharge takes 2\u20133 minutes (drive to headland, discharge, return to field). Planning discharge points at both ends of the field (rather than one end only) reduces the average non-productive headland travel distance and improves overall CT-2100 utilisation.<\/p>\n<p><!-- SECTION: OPERATING SETUP --><\/p>\n<h2 style=\"font-size: clamp(20px,2.8vw+10px,30px); color: #1a1a1a; border-left: 5px solid #f07c00; padding-left: 16px; margin: 48px 0 20px 0; line-height: 1.3;\">CT-2100 Operating Setup \u2014 Getting the Configuration Right Before the First Pass<\/h2>\n<div style=\"display: flex; flex-direction: column; gap: 8px; margin: 14px 0 28px 0;\">\n<div style=\"display: flex; gap: 12px; background: #f0fff0; border-radius: 6px; padding: 12px 16px; border: 1px solid #c0d8c0; box-sizing: border-box;\"><span style=\"color: #2d5f2d; font-size: 1.1em; flex-shrink: 0; margin-top: 2px;\">\u2460<\/span><\/p>\n<p style=\"margin: 0; color: #555; font-size: clamp(12px,1.3vw+8px,14px);\"><strong>Pick-up reel height setting.<\/strong> Set the pick-up reel height so the tines just touch the soil surface without digging in. Too high (tines clear the soil) and smaller stones are missed. Too low (tines dig into the soil) and the CT-2100 picks up excessive soil volume, rapidly filling the bunker with soil rather than stones, and potentially overloading the pick-up reel mechanism on compacted soil. The correct setting is confirmed on the first 20 m test pass \u2014 look back at the collection zone to confirm stones are being picked up cleanly without excessive soil disturbance.<\/p>\n<\/div>\n<div style=\"display: flex; gap: 12px; background: #f0fff0; border-radius: 6px; padding: 12px 16px; border: 1px solid #c0d8c0; box-sizing: border-box;\"><span style=\"color: #2d5f2d; font-size: 1.1em; flex-shrink: 0; margin-top: 2px;\">\u2461<\/span><\/p>\n<p style=\"margin: 0; color: #555; font-size: clamp(12px,1.3vw+8px,14px);\"><strong>Working speed selection.<\/strong> The CT-2100&#8217;s operating speed of 3\u20135 km\/h is the range for effective collection. At the lower end (3 km\/h), the pick-up reel has more time to engage smaller stones \u2014 improving collection completeness on fine-stone passes. At the upper end (5 km\/h), throughput is higher but small stone collection completeness is reduced. For post-THOR collection where crushed material is primarily in the 3\u201310 cm range, 4\u20135 km\/h is appropriate. For post-rake collection of mixed surface stone sizes, 3\u20134 km\/h ensures better completeness on smaller surface stones.<\/p>\n<\/div>\n<div style=\"display: flex; gap: 12px; background: #f0fff0; border-radius: 6px; padding: 12px 16px; border: 1px solid #c0d8c0; box-sizing: border-box;\"><span style=\"color: #2d5f2d; font-size: 1.1em; flex-shrink: 0; margin-top: 2px;\">\u2462<\/span><\/p>\n<p style=\"margin: 0; color: #555; font-size: clamp(12px,1.3vw+8px,14px);\"><strong>Hydraulic remote valve connection and discharge test.<\/strong> Before the first field pass, connect the hydraulic hoses to the tractor&#8217;s rear remote valve ports and confirm the hydraulic flow direction is correct for the discharge operation. With the CT-2100 on level ground and the bunker door closed, cycle the hydraulic control through its full range \u2014 the door should open fully and close fully without hydraulic pressure limitation. If the door operates sluggishly, check tractor hydraulic flow output against the CT-2100&#8217;s 60 L\/min requirement \u2014 some lower-specification 110 HP Korean tractors may have hydraulic output below this requirement, slowing discharge operation.<\/p>\n<\/div>\n<\/div>\n<p><!-- SECTION: MAINTENANCE --><\/p>\n<h2 style=\"font-size: clamp(20px,2.8vw+10px,30px); color: #1a1a1a; border-left: 5px solid #f07c00; padding-left: 16px; margin: 48px 0 20px 0; line-height: 1.3;\">CT-2100 Maintenance Schedule<\/h2>\n<p><img decoding=\"async\" style=\"width: 100%; height: auto; display: block; border-radius: 6px; margin: 20px 0 28px 0;\" title=\"CT-2100 Maintenance \u2014 Seasonal Schedule\" src=\"https:\/\/rock-crusher-tractor.com\/wp-content\/uploads\/2025\/11\/rock-crusher-tractor-bgm-1.webp\" alt=\"Korean highland stone clearing operation \u2014 CT-2100 maintenance schedule prevents seasonal breakdowns during the compressed spring calendar\" \/><\/p>\n<div style=\"overflow-x: auto; margin: 14px 0 28px 0;\">\n<table style=\"width: 100%; border-collapse: collapse; font-size: clamp(12px,1.3vw+8px,14px); min-width: 440px;\">\n<thead>\n<tr style=\"background: #1a1a1a; color: #fff;\">\n<th style=\"padding: 9px 12px; text-align: left; border-right: 1px solid #333;\">Aral\u0131k<\/th>\n<th style=\"padding: 9px 12px; text-align: left; border-right: 1px solid #333;\">G\u00f6rev<\/th>\n<th style=\"padding: 9px 12px; text-align: left;\">Sign of problem if neglected<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr style=\"background: #fff;\">\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Before each session<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Check tine condition; inspect bunker door seals; confirm hydraulic connections secure<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Missing tines = stones not collected; loose hydraulic connection = oil spill and slow discharge<\/td>\n<\/tr>\n<tr style=\"background: #f8f8f8;\">\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Her 8 \u00e7al\u0131\u015fma saatinde bir<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Lubricate pick-up reel bearings; lubricate bunker door hinge pins; check drive chain tension<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Dry bearings squeal under stone impact load and fail rapidly; loose chain skips and damages grader bars<\/td>\n<\/tr>\n<tr style=\"background: #fff;\">\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">After each season<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Replace worn pick-up tines; inspect grader bars for wear and straightness; hydraulic hose condition check; clean and dry before storage<\/td>\n<td style=\"padding: 8px 12px; border-bottom: 1px solid #eee;\">Worn tines = poor small-stone collection in next season; bent grader bars = soil contamination in bunker<\/td>\n<\/tr>\n<tr style=\"background: #f8f8f8;\">\n<td style=\"padding: 8px 12px;\">Annual (or 200 hours)<\/td>\n<td style=\"padding: 8px 12px;\">Drive chain replacement; full bearing inspection; bunker door hydraulic cylinder seal check<\/td>\n<td style=\"padding: 8px 12px;\">Chain fatigue failure mid-season; leaking hydraulic cylinder = slow or incomplete bunker discharge<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><!-- SECTION: INTEGRATION WITH THOR AND RAKE --><\/p>\n<h2 style=\"font-size: clamp(20px,2.8vw+10px,30px); color: #1a1a1a; border-left: 5px solid #f07c00; padding-left: 16px; margin: 48px 0 20px 0; line-height: 1.3;\">CT-2100 in the Korean Stone Clearing System \u2014 Three Operating Scenarios<\/h2>\n<p><img decoding=\"async\" style=\"width: 100%; height: auto; display: block; border-radius: 6px; margin: 20px 0 28px 0;\" title=\"CT-2100 Application \u2014 Post-THOR Collection\" src=\"https:\/\/rock-crusher-tractor.com\/wp-content\/uploads\/2025\/11\/CT-2100-Rock-Picker-application-1.webp\" alt=\"CT-2100 rock picker in Korean highland field \u2014 post-THOR collection pass at 3-5 km\/h covering 1.95m working width\" \/><\/p>\n<p>The CT-2100 serves three distinct operating roles in the Korean stone clearing system, each with a different preceding machine and collection pattern:<\/p>\n<div style=\"display: flex; flex-direction: column; gap: 10px; margin: 14px 0 28px 0;\">\n<div style=\"background: #fff; border: 1px solid #e0e0e0; border-left: 5px solid #f07c00; padding: 16px 18px; border-radius: 0 6px 6px 0; box-sizing: border-box;\">\n<p style=\"font-weight: bold; color: #f07c00; margin: 0 0 8px 0; font-size: clamp(14px,1.5vw+9px,16px);\">Scenario 1: Post-THOR Collection (Primary Role)<\/p>\n<p style=\"margin: 0; color: #555; font-size: clamp(12px,1.3vw+8px,14px);\">The THOR 2.4 crushing pass deposits crushed stone material across the working width. The CT-2100 follows on the same pass lines, collecting the crushed output. On heavy-stone new land, the THOR may need to complete a full field pass before the CT-2100 begins collection \u2014 allowing the stone to settle and the crushed material to be clearly defined in position. On lighter stone, the CT-2100 can follow immediately behind the THOR in the same working session, alternating THOR and collection passes row-by-row. Working speed: 3\u20134 km\/h for thorough post-THOR collection.<\/p>\n<\/div>\n<div style=\"background: #fff; border: 1px solid #e0e0e0; border-left: 5px solid #2d5f2d; padding: 16px 18px; border-radius: 0 6px 6px 0; box-sizing: border-box;\">\n<p style=\"font-weight: bold; color: #2d5f2d; margin: 0 0 8px 0; font-size: clamp(14px,1.5vw+9px,16px);\">Scenario 2: Post-Rake Collection (Light-Year Role)<\/p>\n<p style=\"margin: 0; color: #555; font-size: clamp(12px,1.3vw+8px,14px);\">O <a style=\"color: #f07c00; text-decoration: none; font-weight: bold;\" href=\"https:\/\/rock-crusher-tractor.com\/tr\/urun\/ep-ew-4000-rock-rake-3-6m-tractor-75hp\/\">EP-EW-4000 kaya t\u0131rm\u0131\u011f\u0131<\/a> windrows surface stones into linear piles across the field. The CT-2100 follows in the windrow lines, picking up the concentrated stone windrowed by the rake. This is the most efficient CT-2100 operating scenario \u2014 the stones are already concentrated into a narrow band by the rake, so the CT-2100 pick-up reel engages a high stone density per metre of travel and fills the bunker quickly. Working speed in windrow lines: 4\u20135 km\/h. The CT-2100 is so efficient in windrow collection mode that a single tractor-CT-2100 combination can easily keep pace with a 3.6 m EP-EW-4000 rake in most Korean highland stone conditions.<\/p>\n<\/div>\n<div style=\"background: #fff; border: 1px solid #e0e0e0; border-left: 5px solid #1565c0; padding: 16px 18px; border-radius: 0 6px 6px 0; box-sizing: border-box;\">\n<p style=\"font-weight: bold; color: #1565c0; margin: 0 0 8px 0; font-size: clamp(14px,1.5vw+9px,16px);\">Scenario 3: Direct Surface Collection (Orchard and Pasture)<\/p>\n<p style=\"margin: 0; color: #555; font-size: clamp(12px,1.3vw+8px,14px);\">In orchard alley or pig pasture annual maintenance where neither THOR crushing nor rake windrowing was used, the CT-2100 operates as a direct surface collector \u2014 picking up frost-heave surface stones in a single pass along the alley or pasture. This application requires the slowest working speed (3 km\/h) and the lowest pick-up reel height setting to maximise collection of the varied-size surface stones that have emerged from winter frost heave. Bunker fill rate is slower in direct surface collection than in windrow following because stones are scattered across the surface rather than concentrated.<\/p>\n<\/div>\n<\/div>\n<p><!-- FAQ --><\/p>\n<div style=\"background: #f0fff0; border-left: 5px solid #2d5f2d; padding: 14px 18px; border-radius: 0 6px 6px 0; margin: 0 0 28px 0; box-sizing: border-box;\">\n<p style=\"font-weight: bold; color: #2d5f2d; margin: 0 0 8px 0;\">CT-2100 in Korean local stock<\/p>\n<p style=\"margin: 0; color: #555; font-size: clamp(12px,1.3vw+8px,14px);\">Korea Watanabe holds the CT-2100 rock picker in Korean local stock at Ansan-si, Gyeonggi-do. Standard delivery to Korean farm addresses is 5\u201310 business days from order confirmation. Subsidy documentation (certification document, specification sheet, and price quotation) is prepared within 2\u20133 business days and provided at no charge. Contact Korea Watanabe in January for the upcoming season to ensure delivery before the late-March stone clearing start date at Gangwon-do highland altitudes.<\/p>\n<\/div>\n<h2 style=\"font-size: clamp(20px,2.8vw+10px,30px); color: #1a1a1a; border-left: 5px solid #f07c00; padding-left: 16px; margin: 48px 0 20px 0; line-height: 1.3;\">S\u0131k\u00e7a Sorulan Sorular<\/h2>\n<div style=\"display: flex; flex-direction: column; gap: 0;\">\n<details style=\"border-bottom: 1px solid #e5e5e5; padding: 16px 0;\">\n<summary style=\"font-weight: bold; color: #1a1a1a; cursor: pointer; font-size: clamp(14px,1.6vw+8px,16px);\">Can the CT-2100 collect stones on sloped Korean highland terraces, or is it limited to flat fields?<\/summary>\n<p style=\"margin: 12px 0 0 0; color: #555;\">The CT-2100 can operate on Korean highland slopes up to approximately 15\u201320% gradient \u2014 which covers the majority of Korean highland agricultural terrace gradients. On slopes above this range, the bunker load shifts toward the downhill side during collection, affecting pick-up reel depth uniformity and potentially causing operational issues during the uphill return pass with a full bunker. The practical slope limit for safe CT-2100 operation is similar to that for any loaded tractor-and-implement combination \u2014 confirm that the combined tractor and CT-2100 loaded weight (tractor + approximately 3,000\u20134,000 Kg bunker stone load when full) is within the tractor&#8217;s slope stability limit. For steep Korean highland terraces where the CT-2100 cannot safely operate at full load, collect at 50\u201360% bunker fill to reduce the dynamic load on the slope before discharging.<\/p>\n<\/details>\n<details style=\"border-bottom: 1px solid #e5e5e5; padding: 16px 0;\">\n<summary style=\"font-weight: bold; color: #1a1a1a; cursor: pointer; font-size: clamp(14px,1.6vw+8px,16px);\">What happens to the stones collected by the CT-2100 at the field headland?<\/summary>\n<p style=\"margin: 12px 0 0 0; color: #555;\">The CT-2100 discharges its bunker load at the field headland \u2014 a designated collection point at the edge of the field that truck access allows. From the headland, stones are loaded into dump trucks by front-end loader or excavator and transported to: (1) off-site disposal (dedicated stone collection sites, road fill material, or aggregate recycling); (2) on-farm stone walls or drainage channel fill (traditional Korean highland stone utilisation that also reduces disposal logistics); or (3) temporary farm stockpiles for later removal. For operations where stones are crushed fine enough by the THOR to be left as aggregate (road-building operations), the CT-2100 headland deposit pile can be the final disposition without further trucking. For agricultural clearing where zero residual stone is the goal, all headland deposits must be removed from the field edge before field operations begin \u2014 a stone pile left at the headland can be disturbed back onto the field by subsequent tractor traffic if not promptly removed.<\/p>\n<\/details>\n<details style=\"border-bottom: 1px solid #e5e5e5; padding: 16px 0;\">\n<summary style=\"font-weight: bold; color: #1a1a1a; cursor: pointer; font-size: clamp(14px,1.6vw+8px,16px);\">Why is the CT-2100&#8217;s maximum stone size rated at 80 Kg \u2014 what happens if larger stones are encountered?<\/summary>\n<p style=\"margin: 12px 0 0 0; color: #555;\">The 80 Kg maximum stone size specification is the maximum single stone weight that the CT-2100&#8217;s pick-up reel mechanism can reliably engage and transfer into the bunker without overloading the pick-up reel drive and structural components. Stones above 80 Kg can be engaged by the pick-up reel tines but may stall the reel mechanism, potentially bending tines or overloading the reel drive chain. In practice, the CT-2100 following a correctly operated THOR 2.4 should encounter no stones above 80 Kg \u2014 the THOR is rated to crush all stones up to 30 cm diameter (approximately 35\u201370 Kg for granite of that dimension) before they reach the CT-2100. If the CT-2100 encounters stones above its collection capacity, it indicates that the preceding THOR pass was operated too fast, at insufficient depth, or on stones outside the THOR 2.4&#8217;s 30 cm rated maximum \u2014 signalling a need to revisit the THOR pass parameters on those sections.<\/p>\n<\/details>\n<details style=\"border-bottom: 1px solid #e5e5e5; padding: 16px 0;\">\n<summary style=\"font-weight: bold; color: #1a1a1a; cursor: pointer; font-size: clamp(14px,1.6vw+8px,16px);\">What tractor HP is needed to run the CT-2100 independently from the THOR 2.4?<\/summary>\n<p style=\"margin: 12px 0 0 0; color: #555;\">The CT-2100 requires a minimum 110 HP tractor \u2014 significantly lower than the THOR 2.4&#8217;s 180 HP minimum. This means the CT-2100 can be operated by a standard Korean domestic brand tractor (Daedong\/Kioti, LS, TYM) in the 110\u2013130 HP class, while the THOR 2.4 requires an imported European tractor at 180+ HP. Korean highland farms that own a 180+ HP European tractor for THOR 2.4 operation and a 110\u2013130 HP Korean domestic tractor for general field work can operate the CT-2100 on the Korean domestic tractor \u2014 keeping the 180 HP European tractor dedicated to the THOR 2.4 crushing passes. This two-tractor operational model (one tractor per machine) is the most efficient approach for farms clearing above 5\u201310 ha per season, as it allows the THOR and CT-2100 to work simultaneously on different sections rather than sequentially.<\/p>\n<\/details>\n<details style=\"padding: 16px 0;\">\n<summary style=\"font-weight: bold; color: #1a1a1a; cursor: pointer; font-size: clamp(14px,1.6vw+8px,16px);\">CT-2100 modeli Kore tar\u0131m makineleri s\u00fcbvansiyonlar\u0131ndan yararlanabilir mi?<\/summary>\n<p style=\"margin: 12px 0 0 0; color: #555;\">Yes \u2014 the CT-2100 qualifies under the Korean agricultural machinery purchase support program ( ) in the farmland improvement machinery category ( ), the same category as the THOR 2.4 stone crusher. Korea Watanabe holds the Korean agricultural machinery certification ( ) for the CT-2100 and provides full subsidy documentation (, , ) at no additional charge for CT-2100 purchases. For farmers purchasing both the THOR 2.4 and CT-2100 in the same application year, both machines can be included in a single subsidy application \u2014 subject to the per-farmer annual subsidy cap. Korea Watanabe assists in structuring multi-machine applications to optimise subsidy access across both machines. Contact Korea Watanabe in January to begin the documentation preparation process for the earliest application window.<\/p>\n<\/details>\n<\/div>\n<p><!-- CTA --><\/p>\n<div style=\"background: linear-gradient(135deg,#1a1a1a 0%,#2e2e2e 100%); color: #fff; padding: 4%; border-radius: 6px; margin-top: 56px; text-align: center; box-sizing: border-box;\">\n<p style=\"font-size: clamp(17px,2.3vw+9px,26px); font-weight: bold; margin: 0 0 12px 0; color: #f07c00;\">CT-2100 Availability and Configuration \u2014 Confirm for Your Korean Farm<\/p>\n<p style=\"margin: 0 0 10px 0; color: #ccc; font-size: clamp(13px,1.4vw+8px,15px);\">Farm area (ha) + existing tractor HP + intended use (post-THOR \/ post-rake \/ direct surface) \u2192 CT-2100 operating configuration recommendation with daily capacity estimate and Korean local stock confirmation. Korea Watanabe, Ansan-si, Gyeonggi-do.<\/p>\n<p><a style=\"display: inline-block; background: #f07c00; color: #fff; padding: 13px 40px; border-radius: 4px; text-decoration: none; font-weight: bold; font-size: clamp(13px,1.5vw+9px,16px); letter-spacing: .02em; margin-top: 8px;\" href=\"https:\/\/rock-crusher-tractor.com\/tr\/contact-us\/\">Hemen bizimle ileti\u015fime ge\u00e7in<\/a><\/p>\n<\/div>\n<p>Edit\u00f6r: Cxm<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>CT-2100 Rock Picker \u2014 Complete Operation and Capacity Planning Guide for Korean Highland and Agricultural Farms The CT-2100 is the machine that converts a stone crushing pass into a complete clearance system. Without collection, the crushed material stays in the field. With the CT-2100, it leaves. Understanding how to operate and plan the CT-2100 makes [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[31],"tags":[],"class_list":["post-675","post","type-post","status-publish","format-standard","hentry","category-application-and-technical-guid"],"_links":{"self":[{"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/posts\/675","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/comments?post=675"}],"version-history":[{"count":2,"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/posts\/675\/revisions"}],"predecessor-version":[{"id":677,"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/posts\/675\/revisions\/677"}],"wp:attachment":[{"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/media?parent=675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/categories?post=675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rock-crusher-tractor.com\/tr\/wp-json\/wp\/v2\/tags?post=675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}